How Much Does a Bathroom Remodel Cost in Arizona?
Typical Phoenix range: $12,000–$28,000 for a full remodel of a 40–60 sq ft hall bathroom keeping the existing fixture locations.
A hall or guest bathroom remodel in the Phoenix area typically costs $12,000 to $28,000, while a primary bathroom usually runs $28,000 to $65,000. A tub-to-shower conversion on its own is generally $6,000 to $15,000. As with a kitchen, the cost pivots on whether the fixtures stay where they are — moving a toilet or shower drain means cutting the slab.
Materials
- Tile (floor & walls) — $800–$4,000 per job. Material is often the smaller half of the tile cost. A floor-to-ceiling tiled shower uses far more material and much more labor than a tub surround.
- Vanity & countertop — $600–$4,500 per job. A stock vanity is inexpensive; a custom double vanity with a stone top is a major line in a primary bath.
- Shower pan, glass & door — $700–$4,000 per job. Frameless glass costs several times a framed enclosure and is measured only after the tile is set, which adds two to three weeks to the schedule.
- Toilet — $200–$900 per job. Rarely worth going high-end. A mid-range comfort-height model with a good flush rating does everything an expensive one does.
- Tub — $400–$3,500 per job. A standard alcove tub is cheap. A freestanding soaking tub costs more in itself and requires a floor-mounted filler, which means new plumbing through the slab.
- Fixtures, faucets & hardware — $400–$2,500 per job. Where a bathroom quietly gains a thousand dollars. Choose the finish family once and stay in it.
- Exhaust fan — $80–$400 per job. Small money and genuinely important — an undersized fan is why bathroom paint peels and grout mildews.
Labor & fees
- Demolition & disposal — $500–$1,800 per job. Breaking out old tile and a cast-iron tub is heavy, slow work.
- Tile setting — $1,500–$7,000 per job. The largest labor line and the one where craftsmanship shows. Niches, curbless entries and intricate patterns all add hours. Waterproofing behind the tile is part of this and must not be skipped.
- Plumbing — $800–$4,500 per job. Modest if fixtures stay put. Moving a toilet flange or shower drain means cutting the slab, which is the single biggest avoidable expense in the job.
- Electrical — $400–$2,000 per job. GFCI protection, fan replacement, vanity lighting and often a new circuit if the bathroom shares one with a bedroom.
- Drywall, texture & paint — $500–$1,800 per job. Use a moisture-resistant board behind wet areas, and expect texture matching to be part of the job.
- Permits & inspections — $250–$900 per job. Required once plumbing or electrical is altered.
Same job, three scopes
- Cosmetic refresh — $4,000–$9,000. New vanity, toilet, fixtures, paint and mirror. No tile, no plumbing moves. About a week.
- Tub-to-shower conversion — $6,000–$15,000. Remove the tub, build and tile a shower, new glass. Popular in Arizona for aging in place.
- Full hall bath remodel — $12,000–$28,000. Everything replaced, same layout. Three to five weeks.
- Primary bath remodel — $28,000–$65,000. Larger footprint, double vanity, separate tub and shower, often a layout change. Six to twelve weeks.
Why Arizona is different
- Hard water is hard on a bathroom. Glass shower doors spot and etch, chrome and polished finishes show mineral deposits fastest, and a water softener protects a remodel more than any fixture upgrade does.
- Slab-on-grade means every drain relocation is a concrete job. Keeping the toilet and shower drains where they are can be the difference between a $15,000 and a $25,000 bathroom.
- Curbless and low-threshold showers are in high demand across Arizona's large retiree population. On a slab they require the drain area to be recessed, so decide early — it is not a late change.
- Ventilation matters even in a dry climate. A bathroom with a weak fan traps moisture in the one room that generates it, and mildew in grout is the result.
- Natural stone tile needs sealing and re-sealing against hard water. Porcelain that imitates stone avoids that maintenance entirely and is the more practical Arizona choice.
What it costs in your metro
- Phoenix — $12,000–$28,000. The baseline. The deepest pool of licensed contractors in the state, so competitive bidding keeps prices closest to material cost plus a normal margin.
- Mesa & the East Valley — $12,000–$27,500. Same supplier network as Phoenix with slightly lower overhead, and enough contractors that most jobs draw competing bids. Expect Phoenix pricing or a little under.
- Scottsdale — $14,000–$33,000. Higher labor rates, stricter HOA and design-review requirements on anything visible from the street, and a default expectation of upper-tier finishes. The permit and approval time alone adds cost. Primary bath remodels here skew larger and higher-spec, and HOA review can apply if a window or exterior vent changes. Budget above Valley baseline.
- Tucson — $11,500–$26,500. Lower labor rates than the Valley and a slightly cheaper cost of doing business, though specialty materials are often trucked down from Phoenix.
- Flagstaff — $14,500–$34,000. A genuine freeze-thaw and snow-load climate, which changes what the code requires, plus a small contractor pool and haul distance on almost every material. The most expensive metro in the state for most work. Any plumbing on an exterior wall needs freeze consideration, and the smaller contractor pool means booking a tile setter takes longer than in the Valley.
- Prescott & the Quad Cities — $13,500–$31,500. Freezing winters, wildfire-related material requirements in many areas, and fewer contractors bidding than the Valley. Haul distance shows up on anything delivered by the truckload.
- Yuma — $12,500–$29,500. The most extreme heat in the state drives equipment sizing and shortens summer working hours, and the local trade pool is thin enough that scheduling — not material — is often what costs you. Scheduling is the constraint more than price — a smaller trade pool means fewer crews bidding and longer waits for specialty work like frameless glass.
How to spot a quote that is off
- No mention of waterproofing behind the tile. Tile is not a waterproof layer; the membrane behind it is, and skipping it fails invisibly for two years and then expensively.
- A tub-to-shower conversion quoted in one day. A properly built and waterproofed tiled shower cannot be done that fast.
- No allowance stated for tile and fixtures you have not chosen yet.
- A bid that omits the exhaust fan on a bathroom that currently vents poorly.
- No permit on a job that moves plumbing.
Common questions
How long will I be without the bathroom?
Three to five weeks for a full hall bath. Much of that is waiting rather than working — waterproofing has to cure, tile has to set before grouting, and frameless glass is measured only after tile is complete and then takes two to three weeks to fabricate.
Is a tub-to-shower conversion a bad idea for resale?
Only if it leaves the house with no tub at all. In an Arizona market with many retiree buyers, a well-built walk-in shower in the primary bath is usually a positive. Keeping one tub somewhere in the house covers families with young children.
Why is my bathroom quote higher than my neighbor's for the same size room?
Check three things before assuming it is margin: whether either job moves a drain, how much of the shower is tiled versus a prefabricated pan and surround, and whether the glass is framed or frameless. Those three account for most of the spread between two same-size bathrooms.
These are typical Arizona market ranges for the scope described, gathered to help you judge whether a quote is reasonable. They are not a quote, and they are not live pricing. Your own job can fall outside them for perfectly good reasons — get at least three written bids before deciding. Last reviewed August 2026.
All Arizona cost guides ·
Price your own job with the Homeowner plan